Hayward AquaRite LTO automatic chlorine generator. It is intended for sanitary processing of water in the pool. The operation of the chlorinator is based on the cyclic principle of converting salt into chlorine, using a remote electrolytic cell. The chlorine produced prevents the development of algae, microbes and bacteria in the pool water. The installation provides not only cleaning, but also softening the pool water. Depending on the optional extension, you can adjust the pH and ORP of the water. The AquaRite LTO is equipped with a 2.8" LCD color screen. It is the ideal solution for private pools up to 65 m³.
Reason for price reduction: housing has been repaired after damage.
- For 65 m³ swimming pools
- Salt concentration: 3.2 to 100 g/l
- Chlorine production potential: 16 g/h
- Connection: 63 mm
Characteristic
| Article | AQR-LTO-SV16 |
|---|---|
| Safety data | Download |
| Downloadable materials | Instruction |
| Recommended pool volume, m³ | To 100 |
| Purpose | Home pools |
| Additional features | Digital control panel, Rx analysis, pH analysis |
| Principle of action | Production of chlorine |
| Protection class | IP54 |
| Additional information |
|
| Equipment |
|
| Size | 270 х 220 х 115 mm |
| Manufacturer | Hayward |
| Country of Manufacture | Испания |
| Consumables warranty | Cell service life: 8000 hours (The indicated service life is guaranteed if the cell is used in water equivalent to drinking water. The presence of salts, metals and other impurities can reduce the service life of the cell.) |
Reviews and Questions (0)
Your review about Chlorine generator Hayward AquaRite LTO (65 m3, 16 g/h), markdown will help other buyers make the right choice.
- In-store pickup
- DPD courier
- Raben courier
- PayU money transfer (in development)
- Cash on pickup
- Bank transfer
- All orders placed Monday through Friday before 12:00 pm are processed the same day. An exception is the peak season (June, July) – orders placed during this period will be shipped from our warehouse within 3 business days."
- Orders placed after 12:00 Friday will be processed on Monday.






After moderation it will be published