Hayward K-FLO SPK12630XY3 centrifugal pump with prefilter. Used to filter and circulate water in private pools up to 132,000 liters. The pump housing and prefilter are made of thermoplastic. Hydraulic units made of Noryl and AISI 316 steel allow the pump to be used with salt and sea water. Equipped with a large capacity pre-filter. When installing the pump, an additional installation of a motor protection switch is required.
Reason for the price reduction: the pump has been restored to factory condition. It comes in an Aquamonkey box and includes couplings.
- Capacity: 33 m³/h
- Power: 2.75 kW
- Connection: 63 mm
Characteristic
| Article | SPK12630XY3 U2 |
|---|---|
| Safety data | Download |
| Downloadable materials | Guidelines |
| Purpose | Private pools, Public pools |
| For salt water | Yes |
| Engine energy efficiency | IE3 |
| Presence of a prefilter | Yes |
| Variable speed | No |
| Number of phases | 3 (380–400 V) |
| Maximum volume of the serviced pool, l | 132 000 |
| Productivity, m³/h (at h) | 33 at 10 m |
| Useful power, l.s. | 3 |
| Power, kW | 2.8 |
| Connection | 63 mm |
| Additional information |
|
| Packed weight, kg | 23.0 |
| Size | 620х311.7х244 mm |
| Manufacturer | Hayward |
| Country of Manufacture | Франция |
| Product warranty | 24 months with regular maintenance and replacement of consumables. A motor protection circuit breaker is mandatory. The three-phase pump connection and breaker setup must be done by a qualified electrician according to the nameplate data. |
Reviews and Questions (0)
Your review about Pump Hayward K-FLO SPK12630XY3 IE3 (380 V, 33 m3/h, 3 HP), markdown will help other buyers make the right choice.
- In-store pickup
- DPD courier
- Raben courier
- PayU money transfer (in development)
- Cash on pickup
- Bank transfer
- All orders placed Monday through Friday before 12:00 pm are processed the same day. An exception is the peak season (June, July) – orders placed during this period will be shipped from our warehouse within 3 business days."
- Orders placed after 12:00 Friday will be processed on Monday.





After moderation it will be published